What we do, and how we do it
Composite decking is the right choice when you want the look of timber without the maintenance. The boards are capped, so they do not absorb water, they do not splinter and the colour stays where it started. The frame underneath is what decides whether the deck feels solid in year five, so we build it on treated or aluminium joists at the right centres, with the correct fixings and a slight fall so it drains.
We install it as standalone decks, as level changes between a patio and a lawn, and as wraparound terraces for bifolds. The fascia and edge details are the part you notice every day, so we take the time to get them clean and consistent.
Your options
Choosing what goes down
Capped composite boards
Fully capped boards with a protective shell on all sides. Resistant to stains, moisture and fading, and they clean with a brush and water.
Aluminium sub-frame
A metal joist system that will not rot, warp or split. More expensive than timber but it lasts the life of the boards and keeps the deck perfectly level.
Treated timber sub-frame
Pressure-treated timber joists with the correct spacing and fixings. Proven, cost-effective and easy to inspect in the future.
Fascia and edge trims
Matching boards used to box in the frame and finish the exposed edges, so the deck looks built rather than bolted together.
What's included
Every quote covers
- Site survey and levels before we quote
- Design of the deck shape, board direction, steps and fascia details
- Removal of the old deck or surface and any spoil
- Treated timber or aluminium sub-frame built to the correct centres
- Composite boards laid and fixed with colour-matched fasteners
- Fascia boards, edge trims and any steps or balustrade
- Full clear-up and the deck brushed down before handover
FAQs
Composite decking questions we get asked
How long does composite decking take to install?
A straightforward ground-level deck is usually three to five days. Add a couple of days if it is raised, has steps or a balustrade, or if the old deck has to be removed first.
Does composite decking need planning permission?
Usually no. Decking under 300mm above ground level and covering less than half the garden normally falls under permitted development. Raised decks that overlook a neighbour, or decks in front gardens, can need consent. We check at the site visit.
Is composite decking slippery?
Good quality capped composite has a slip-resistant grain and is generally less slippery than timber when wet. The main safety issue is usually the frame, not the surface, which is why we build it level and secure.
Can you build it over an existing patio?
Sometimes, if the existing base is sound and has a fall. More often we take the old surface out and build the frame from scratch so the deck drains properly and does not rock.
How much does composite decking cost?
Most composite decks we build land between £4,000 and £12,000. Size, height, frame choice and access move the number. Every price is fixed in writing after a site visit.
What guarantee do you offer?
Our workmanship is guaranteed and the boards carry their manufacturer warranty. Because our own crews build the frame and lay the boards, there is one company to come back to if anything needs attention.
Also worth a look
Related services
Fencing & Decking
Composite, slatted, closeboard and picket fencing, composite and timber decks, trellis and gates, all set in concrete and squared up.
Fencing & DeckingFull Garden Transformations
Levels, structure, paving, planting and lighting, the whole garden in one programme.
Full Garden TransformationsPatios & Paving
Porcelain and Indian sandstone terraces, laid on a proper sub-base with falls and drainage.
Patios & Paving
Free site visit
Get a fixed price for your composite decking
We'll come out, look at the space and give you a proper fixed price, not a ballpark over the phone.


